Electrical and Instrumentation services

Project Type: الاعمال الكهربائية والاجهزة الدقيقة

The WORK includes the following activities: 

Part 1:

  • Cable trench 
  • Auger boring
  • Installation of HV joint pit
  • Installation of cable maker and earthing pit

 

Part 2 :

(Power, instrumentation, earthing, FOC) according to the cable schedule listed below:

The cable laying work include:

  • Load, haul and offload the cable drums from Company warehouse to the location on site as required.
  • Cutting and measure insulation resistance of the cable reels as delivered to site.
  • Stamping and fixing of cable identification tags, temporary sealing of cable ends.
  • Cable protection and temporary capping for the ends of cables including ends of cable on drums or coils after cutting.
  • Cleaning conduit pipes, ducts, duct banks, and trays, cabling through sleeves, sealing of duct bank and the like.
  • Determining required cable length at the tail end for connection to the equipment.  
  • The residual length on each drum after cutting shall be clearly marked on the side of the drum.
  • Rollers shall be used for cable pulling, the rollers shall be well maintained and in good working order.
  • When cables are installed but cannot be immediately terminated, they shall be coiled up at the terminal point in a neat an orderly manner.
  • Provide and install PVC conduit for cable laying as per drawings.