• :تجدنا
  • Basra, Iraq

EPC for Warehouse & Canteen ( Electrical , Instrument , CCTV )

Project Type: الاعمال الكهربائية والاجهزة الدقيقة

The electrical system of project includes distribution system. The power source supplying to the office, guardroom warehouse, pump and so on comes from the existing main distribution board located near generators. through LV power cable which come from the outgoing feeder of 400V switchgear. The existing main distribution board shall be modified to satisfy the requirement.

The 400V power cable shall be laid directly to the new main distribution panel (AP01). In addition, 1 Nos. 3kVA AC UPS system integrated with 60min lead-acid maintenance free battery cabinet will be installed in the office All LV loads will be powered from LV main distribution panel. 

 

The electrical work shall include, but not limited to the following: 

  • 0.4kV Switchgear modified 
  • Distribution panels 
  • AC UPS 
  • LV power distribution system
  • Lighting system 
  • Cabling system 
  • Earthing & Lightning system 

 

Telecommunication Systems 

Midad are fully responsible for design, fabrication, inspection, test, supply, transport and installation of the equipment and materials and be experienced, qualified and fully accredited in the design, fabrication and testing of Telecommunication System.


The following network shall be considered (office building, guardroom and warehouse): 


LAN network includes wired LAN and Wireless network(only office work and Internet). the wired LAN includes the following services: 

  • Office work and Internet 
  • CCTV 

 

Building Fire Alarm System 

All necessary connection reservation with existing systems of CAMP should be considered. It shall be an integrated system of whole CAMP in order to unify management and operation. All new installed equipment’s brand and performance shall be compatible with the existing equipment of camp and be provided by the same manufacturer. For detail, refer to the Design Basis. 

 

Fibber optical cable

There are 2 pcs 24 cores fibre optical cables should be laid from Warehouse A electric room of office building to the camp existing building -2 server room existing LAN cabinet, which are armoured directly buried FOC used for data transmission, required FOC connection with patch panel at the camp existing building -2 server room existing LAN cabinet and other accessories supplied by EPC CONTRACTOR

 

 